Micro Wind Turbine

 

Design-and-build project for MAE 360 at CWRU during the Fall 2010 semester. I designed and manufactured approximately 85-90% of the project. The remaining 10-15% was created by Adam Jones, Bobby Bott, and Greg Miranda. The control architecture was developed by Bobby Bott and Amber Abbott.
The entire project was completed in a 3-month timeframe.

Leave a Reply